Progress
A running snapshot of where the build is. Update this file as things move.
Status at a glance
| Subsystem | Status | Notes |
|---|---|---|
| System spec (RO-SPEC-001) | Rev G — published | Regulatory traceability added (NSF/ANSI 61, MFF) |
| Tank sourcing (T-101, T-102) | Spec published | Looking at modified Sanke kegs as primary path |
| Metering pumps | Spec published | Three identical diaphragm pumps |
| Bill of materials | Rev F — current | See BOM |
| PLC / controls | Parts being acquired (Phase 1) | Productivity2000 P2-550 ordered |
| VFDs | Phase 2 — eBay watch | Highest path-dependency item |
| Sensors / instruments | Phase 3 | Not started |
| Output devices | Phase 4 | Not started |
| HMI | Phase 5 | Not started |
| Physical assembly | Phase 6 | Not started |
| Permitting (San Diego DEH) | Pre-submittal | See regulatory |
Recent changes
- BOM moved to Rev F
- System spec advanced to Rev G with regulatory traceability
- Site published at water.paleotreats.com
Next milestones
- Finalize tank sourcing — confirm Sanke keg modifier or commit to custom build
- PLC bench setup with first I/O test
- Initial draft of HMI screens
- Pre-submittal meeting with San Diego DEH